Chippewa Nature Center
Nature Preschool Construction
Renovation Phase I of II

See Phase II - Visitor Center


July 6, 2009

Move-in!

 




July 6, 2009

Newly stained floors!



May
4, 2009

This empty classroom will soon
be filled with kid-size furniture
and bustling with
young preschoolers.

 



May
4, 2009

The hallway windows
are all installed!

 




May
4, 2009

A view towards the kitchen and
restroom. The outer door is still
needed, but this is close to
a completed view!



May
1, 2009

Harbron Electric puts
the final touches on
the electrical system.

 



May
1, 2009

Careful measurements were made
before installing this door on the
mezzanine level mechanical room.

 




May
1, 2009

A clear coat finish goes on
the window frames before
the glass is installed.



April 27, 2009

The front porch will
soon be complete.



April
27, 2009

Nowak Cabinets installed the cabinetry including the “book nook” shown here. The shelf on the bottom cabinets is made of wood salvaged from the Visitor Center auditorium.

 


April 23, 2009

Work begins on the pavilion entry
to Arbury Trail and the
Preschool entrance.



April 23, 2009

A peek inside the mechanical
room - the same room
as in the March 30 photo!


April
23, 2009

There’s lots and lots of
electrical work being done.



April 23
, 2009

The first paint is on the wall
as other work continues.


April 23, 2009

A view from just inside the
front door of the preschool
looking towards the back door.


April
23, 2009

The power transformer for
the preschool and remodeled
Visitor Center is now
in its new location.



April 22, 2009

The dual flush toilets are installed (seats to come). That’s right -
you can choose the amount of
water needed for the flush!

 



April 22, 2009

Steady hands bring a
beautiful finish to the hardware throughout the building.


April 21, 2009

Work continues on connecting the water line to the preschool.



April 21, 2009

Work continues on connecting the water line to the preschool.


April 20, 2009

Hatfield Construction prepares
to install the exterior door
on the back porch.


April
20, 2009

The view from inside the
southern classroom looking
towards Arbury Pond.

 




April 20
, 2009

Tri City Custom Tile installs tile
in the preschool classrooms.


April 17, 2009

Work begins on the boardwalk connecting Arbury Trail to the preschool entrance.


April 15
, 2009

Drywall work is well underway.



April 14
, 2009

Hatfield Construction begins work
on the boardwalks on the path connecting the parking lot
to the preschool.


April 14, 2009

Norway spruce harvested from
CNC property is the ceiling finish
for the preschool classrooms.


April 8
, 2009

A view of Nature Preschool
across Arbury Pond.



April 6
, 2009

The tile is being installed in
the preschool restrooms.


April 1, 2009

A view from inside the front entry
towards the back door.


March
30, 2009

The top of the clerestory is now
the home of 5 solar panels for the
domestic hot water system.



March
30, 2009

Soon to be hidden behind the
mechanical room walls is the
535 gallon storage tank for the
radiant heating system.



March
24, 2009

The finished concrete floor will have
a colored stain to provide color
and depth to the space.


March
24, 2009

The concrete floor is poured in
the Nature Preschool.



March
23, 2009

Fisher Contracting installs the
water main by the entrance to
the Visitor Center parking lot.


March
19, 2009

Answer Heating & Cooling installs floor loops for the radiant heating
and cooling system.


March
19, 2009

Answer Heating & Cooling installs floor loops for the radiant heating
and cooling system.



March
16, 2009

It’s been great weather for roofing!
The traditional shingles are being installed on the north portion of the preschool. The south side roof will have photovoltaic shingles installed.

 

 



March
4, 2009

The siding installation continues, wrapping around the west side
of the building.


March
3, 2009

Ash siding is being installed on
the exterior of the preschool.
The ash has gone through a unique kiln drying process that makes it extremely resistant to rot, while darkening it to a rich brown color.



February 20, 2009

Let there be light! The "H" windows, designed to balance daylighting and energy efficiency, are being installed.

 



February 13, 2009

A boom lifts the roof
onto Nature Preschool.

Raising the Roof Video

Need Quicktime to view?


February 13, 2009

The very top of the preschool roof
is constructed on the ground
before being installed.



February 9, 2009

The Nature Preschool is closed-in
and wrapped allowing contractors
to install temporary heat so the installation of the plumbing and geothermal floor loops can proceed.


February 3, 2009

The crane lifts the first roof
structural insulated panel (SIP)
onto the Nature Preschool roof.


February 2, 2009

The Nature Preschool beams and
lower structural insulated panels (SIPs) are in place. Here the window framing is being installed, and will
soon be followed by roof SIPs.

back to top




January 27, 2009

Nature Preschool


January 27, 2009

Structural insulated panels (SIPs)
for the
Nature Preschool
building
are installed.


January 26, 2009

The glue laminated beams
seen here provide the skeleton
of the Nature Preschool building.

back to top




January 24, 2009

Nature Preschool teachers
Erin Soper, Shannon McGinnis
 and Steve Frisbee pose in front of their soon-to-be classrooms.


January 23, 2009

Contractors from throughout the Saginaw Valley are working
together to build the Nature Preschool. Preparing the beams
for installation is Scott from
Hatfield Construction of Midland.


January 21, 2009

The first beam is in place!
There will be close to 40 glue laminated beams that
will provide the skeleton
for the building.

back to top




January 8, 2009

Snow and ice are making things interesting on the construction site. Here the worker is breaking up
frozen ground for plumbing to be placed. The blue pipes are serving
as above-snow makers for
the pier locations.


December 22, 2008

Helger Construction works on
the Nature Preschool
footings and foundations.


December 17, 2008

Fisher Contracting
installs the storm drain.

back to top

 




December 8, 2008

The first step in constructing the preschool was the placement and pouring of footings which transmit the load of the building to the soil.


November 21, 2008

Rowe, Inc. was involved early
in the project to survey the site.


September 11, 2008

Chippewa Nature Center
breaks ground on the
Visitor Center expansion.